1.7 Initial Power-On Verification
A preliminary functional check of the Cygnus 2 can be made before formal
installation. It is not necessary to have sensors, source controls, inputs or relays
connected to do this. For more complete installation information, see Chapter 2,
Installation and Interfaces and Chapter 10, Maintenance and Calibration
Procedures.
WARNING - Risk Of Electric Shock
There are no user-serviceable components within the
Cygnus 2 case.
Dangerous voltages may be present whenever the power
cord or external input/relay connectors are present.
Refer all maintenance to qualified personnel.
WARNING - Risk Of Electric Shock
Never interrupt the protective earth circuit.
Any interruption of the protective earth circuit inside or
outside the Cygnus 2, or disconnection of the protective
earth terminal is likely to make the Cygnus 2 dangerous.
This symbol indicates where the protective earth ground
is connected inside the Cygnus 2. Never unscrew or
loosen this connection.