Inficon Cygnus 2 Thin Film Deposition Controller Manuale Utente Pagina 38

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 37
1 - 20
IPN 074-545-P1E
Cygnus 2 Operating Manual
1 Confirm that AC line voltage is supplied and proper for the Cygnus 2.
2 Confirm that the back panel (main) AC switch is in the ON position.
3 Press the ON/STBY button on the front panel. A green pilot light should be
illuminated next to the power switch.
4 The fan at the back of the Cygnus 2 should be exhausting air.
5 After the initial temporary boot-up screen which can be viewed in Maintenance
Sys Status, the LCD monitor will display an image similar to the one shown in
Figure 1-1 or Figure 1-2.
Figure 1-1 Operate screen show graph
Figure 1-2 Operate screen show all materials
Vedere la pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 273 274

Commenti su questo manuale

Nessun commento